DOE has initiated round robin testing of residential dishwashers. Each test lab shall test the selected dishwasher in strict accordance with the test procedure indicated in Table 1, including all tests necessary to measure and calculate the key metrics listed in Table 1. Each participating lab will test the selected dishwasher in accordance with the DOE test procedure three (3) times for a total of three (3) tests.

DOE is now accepting requests for test slots!

Table 1: Test Procedures and Key Metrics
Appliance Type Applicable DOE Test Procedure from 10 CFR Part 430 Subpart B Key Performance Metrics for Each Test
Residential Dishwasher Appendix C, Uniform Test Method for Measuring the Energy Consumption of Dishwashers [68 FR 51900, Aug. 29, 2003]
Estimated Annual Energy Use (kWh/year)
Water Consumption (gal/cycle)
Energy Factor (cycles/kWh)
Table 2: Test Quantities
Appliance Type Number of Test Units Tests/Unit Total Tests
Residential Dishwasher 1 3 3

Test Procedure

The applicable test procedure is contained at 10 CFR 430 Subpart B Appendix C: Uniform Test Method for Measuring the Energy Consumption of Dishwashers [68 FR 51900, Aug. 29, 2003].

Schedule

Schedule updated 5-27-11.

DOE is accepting requests for test slots. Test slot duration indicates period from receipt of test unit(s) to submittal of test reports and preparation of test unit(s) for shipment. All shipment locations must be within the U.S. or Canada.

Interested labs are encouraged to contact us with their first and second choice of test slot. Available test slots are listed as 'Open' in the schedule below.

Week Ending DW 1 DW 2 DW 3
13-May-11 Slot 1 Reserved Slot 1 Reserved Slot 1 Reserved
20-May-11 Slot 1 Reserved Slot 1 Reserved Slot 1 Reserved
27-May-11 Slot 1 Reserved Slot 1 Reserved Slot 1 Reserved
3-Jun-11 shipping shipping shipping
10-Jun-11 shipping shipping shipping
17-Jun-11 Slot 2 Reserved Slot 3 OPEN Slot 4 OPEN
24-Jun-11 Slot 2 Reserved Slot 3 OPEN Slot 4 OPEN
1-Jul-11 Slot 2 Reserved Slot 3 OPEN Slot 4 OPEN
8-Jul-11 shipping shipping shipping
15-Jul-11 shipping shipping shipping
22-Jul-11 Slot 5 Reserved Slot 6 Reserved Slot 7 Reserved
29-Jul-11 Slot 5 Reserved Slot 6 Reserved Slot 7 Reserved
5-Aug-11 Slot 5 Reserved Slot 6 Reserved Slot 7 Reserved
12-Aug-11 shipping shipping shipping
19-Aug-11 shipping shipping shipping
26-Aug-11 Slot 8
Reserved
Slot 9
Reserved
Slot 10
Reserved
2-Sep-11 Slot 8
Reserved
Slot 9
Reserved
Slot 10
Reserved
9-Sep-11 Slot 8
Reserved
Slot 9
Reserved
Slot 10
Reserved