Round Robin Testing – Water Heaters

DOE has initiated round robin testing of water heaters. Each test lab shall test the selected water heaters in strict accordance with the test procedure indicated in Table 1, including all tests necessary to measure and calculate the key metrics listed in Table 1. Each participating lab will test the four (4) selected water heaters in accordance with the DOE test procedure three (3) times for a total of twelve (12) tests.

DOE is now accepting requests for test slots!

See Schedule below.

Table 1: Test Procedures and Key Metrics
Appliance Type Applicable DOE Test Procedure from 10 CFR Part 430 Subpart B Key Performance Metrics for Each Test
Gas-Fired Storage Water Heater Appendix E, Uniform Test Method for Measuring the Energy Consumption of Water Heaters [66 FR 4497, Jan. 17, 2001] Energy Factor
First Hour Rating [gallon]
Gas-Fired Instantaneous Water Heater Appendix E, Uniform Test Method for Measuring the Energy Consumption of Water Heaters [66 FR 4497, Jan. 17, 2001] Energy Factor
Max GPM
Table 2: Test Quantities
Appliance Type Number of test Units Test/Unit Total Tests
Gas-Fired Storage Water Heater 2 3 6
Gas-Fired Instantaneous Water Heater 2 3 6

Test Procedure

The applicable test procedure is located at Appendix E, to Subpart B of 10 CFR Part 430.

Schedule

Schedule updated 06-03-11.

DOE is accepting requests for test slots. Each test slot represents the period from receipt of test unit(s) to submittal of test reports and preparation of test unit(s) for shipment. All shipment locations must be within the U.S. or Canada.

Interested labs are encouraged to contact us (roundrobintesting@ee.doe.gov) with their first and second choice of test slot. Available test slots are listed as "Open" in the schedule below.

Week Ending WH 1 WH 2 WH 3 WH 4
15-Jul-11 Slot 1 – Independent Lab
OPEN
22-Jul-11
29-Jul-11
5-Aug-11
12-Aug-11 shipping
19-Aug-11 Slot 2 – Independent Lab
OPEN
26-Aug-11
2-Sep-11
9-Sep-11
16-Sep-11 shipping
23-Sep-11 Slot 3 – Manufacturer Lab
OPEN
30-Sep-11
7-Oct-11
14-Oct-11
21-Oct-11 shipping
28-Oct-11 Slot 4 – Independent Lab
OPEN
4-Nov-11
11-Nov-11
18-Nov-11
25-Nov-11 shipping
2-Dec-11 Slot 5 – Manufacturer Lab
OPEN
9-Dec-11
16-Dec-11
23-Dec-11
30-Dec-11 shipping
6-Jan-11 Slot 6 – Manufacturer Lab
OPEN
13-Jan-11
20-Jan-11
27-Jan-11