Skip Navigation to main content U.S. Department of Energy U.S. Department of Energy Energy Efficiency and Renewable Energy
Bringing you a prosperous future where energy is clean, abundant, reliable, and affordable EERE Home
Federal Energy Management Program
 
About the ProgramProgram AreasInformation ResourcesFinancing MechanismsTechnologiesServicesHome
Super ESPCs Types of Super ESPCs Contract Tools and Guidance ESPC Basics Phase 1: Project Planning Phase 2: Initial Project Development Phase 3: Negotiation and Award of Final Delivery Order Phase 4: Implementation Phase 5: Performance Period Measurement and Verification Resources Compiling an Agency Project Binder Qualified ESCOs Super ESPCs Legislation and Regulations Awarded Contracts Case Studies FEMP Assistance Contacts UESCs Energy-Efficiency Incentive Programs

Measurement and Verification (M&V) Resources

Some of the following documents are available as Adobe Acrobat PDFs. Download Adobe Reader.

Introduction to M&V for FEMP Super ESPC Projects (PDF 181 KB)
An overview of why and how M&V is conducted in Super ESPC projects. Topics include allocating project risk, steps to verify savings, and M&V plans and reports.

M&V Planning Tool
An iterative exercise to help identify key issues and develop M&V strategies suited to individual projects, in three parts:

  1. M&V Planning Instructions (MS Word 61 KB)
  2. M&V Considerations Matrix (PowerPoint 57 KB)
  3. M&V Planning Flow Chart (PowerPoint 39 KB)

Planning and Reporting for Operations & Maintenance in Federal ESPCs (PDF 159 KB)
Guidance on clearly delineating O&M, repair and replacement, and reporting responsibilities in the contract to protect the government's interests.

Including Retro-Commissioning in Federal ESPCs (MS Word 44 KB)
How Retro-Cx can be used to provide substantial benefits in Super ESPCs.

Example Retro-Commissioning Scope of Work to Include Services as Part of a Super ESPC Detailed Energy Survey (MS Word 44 KB)
The steps for implementing Retro-Cx as an energy conservation measure in Super ESPCs.

M&V Plan and Report Outlines (Attachment 7 in 2004 IDIQ Modifications)
M&V Plans and reports are required to follow these outlines:

Example M&V Plan for a Super ESPC Project (PDF 397 KB)

Review Guidance for M&V Plans and Reports—Instructions, Templates, and Checklists

Guide to Government Witnessing and Review of Post-Installation and Annual M&V (PDF 148 KB)
Guidelines, plus appendixes: using a graded approach to M&V oversight; a template for witnessing records; and contract clauses and suggested DO RFP language.

FEMP M&V Guidelines v3.0 (PDF 1.1 MB)
FEMP's standard procedures and guidelines for M&V for federal energy managers, procurement officials, and energy service providers—M&V Guidelines: Measurement & Verification for Federal Energy Projects Version 3.0.

Detailed Guidelines to FEMP M&V Option A (PDF 130 KB)
An extension of the FEMP M&V Guidelines, providing the information needed to ensure that Option A and stipulations are used appropriately to achieve the intended effect.

Proper Use of Option A and Stipulations in M&V (MS Word 78 KB)
A less technical summary of the Detailed Guidelines to FEMP M&V Option A.

M&V Resources and Training Opportunities (PDF 219 KB)
Information on more M&V resources.

International Performance Measurement and Verification Protocol (IPMVP) (2001)
The standard reference for M&V protocols, produced by a consortium of industry, academic, and government professionals. The FEMP M&V Guidelines are an application of IPMVP.

FEMP Half-Day M&V Training Course (PowerPoint 116 KB) (PowerPoint 499 KB) (PowerPoint 471 KB) (PowerPoint 185 KB)
Slides from the training course that is offered in conjunction with FEMP's Super ESPC workshops.

More Information on M&V