Step 3 is the DO (implementation and operation) part of the PLAN-DO-CHECK-ACT continual improvement model of the energy management system (EnMS). DO is concerned with implementation of the results (outputs) of the PLAN process using mechanisms that can make energy management part of the daily operations of an organization. These mechanisms include competence, training and awareness, documentation, communication, operational controls, as well as design and procurement.
Using these mechanisms, the key items to implement in Step 3 are:
- management of the significant energy uses
- management of the energy-related legal and other requirements
- improvements in energy performance through implementation of the actions plan(s)
The key components of energy performance include:
- the significant energy uses and their associated controls,
- the energy objectives and their associated targets and action plans,
- sustaining past energy performance improvements over the long term, and
- proper operation and maintenance of the energy systems.
To implement energy management and take action toward energy performance improvement, the following steps are taken:
- Step 3.1 Ensure proper resources are allocated
- Step 3.2 Execute the action plan(s)
- Step 3.3 Manage and control information
- Step 3.4 Address training and communication needs
- Step 3.5 Establish operational controls
- Step 3.6 Manage energy considerations in design
- Step 3.7 Incorporate energy considerations in procurement
- Step 3.8 Define specifications for purchasing energy supply